Start Date: 2017
Completion Date: 2019

Vineyard Wind Connector (Barnstable)

Project Applicant: Vineyard Wind LLC 
Project Location: Town of Barnstable, with offshore export cable landing at Covell’s Beach and onshore export cable terminus at existing substation in Independence Park, Hyannis 
Project Description: Construction and operation of the portion of the Vineyard Wind Connector Project located within Barnstable County, which Project is intended to connect to and serve the proposed approximately 800 megawatt Vineyard Wind offshore wind project; offshore export cables located within Barnstable County waters, the onshore duct bank and associated onshore export cables within existing rights of way, and the proposed onshore substation. 


Physical application files are available for review at the Cape Cod Commission Office Monday-Friday from 8 a.m. to 4:30 p.m. Contact the Front Desk for more information, 508-362-3828.

Project Resources

View All Resources

51M pdf
Aug 31, 2021
Vineyard Wind Connector 1_SWPPP_08312021
Plan for Onshore Duct Bank, Water Infrastructure Modifications, and Transition Joint Bay7/15/2021 Rev. 0   Stormwater Pollution Prevention Plan …
35M pdf
Jun 06, 2019
VW Connector DRI recorded decision
dept/commission/team/member/Project Documents/Prior Projects/Vineyard Wind Connector/VW Connector DRI recorded decision.pdf … {A1813550-FB12-4470-AA81-7177890EC134},2
50K pdf
Apr 16, 2021
2021-04-16 Vineyard Wind Connector 1 Conditions 6 and 7
File Link CCC-DRI Decision Shared with Contractors_ Linxon (LNA) and Lawrence Lynch (LLH) https://epsilon.sharefile.com/d-s6cb3a850ad8b4a9cbcbba05em2432ead Permit/License/Approval …
Search Circle Icon Search Icon Document Icon Video Icon PDF Icon CSV/XLS Icon