Skip to Navigation Skip to Content
Start Date: 2017
Completion Date: 2019

Vineyard Wind Connector (Barnstable)

Project Applicant: Vineyard Wind LLC 
Project Location: Town of Barnstable, with offshore export cable landing at Covell’s Beach and onshore export cable terminus at existing substation in Independence Park, Hyannis 
Project Description: Construction and operation of the portion of the Vineyard Wind Connector Project located within Barnstable County, which Project is intended to connect to and serve the proposed approximately 800 megawatt Vineyard Wind offshore wind project; offshore export cables located within Barnstable County waters, the onshore duct bank and associated onshore export cables within existing rights of way, and the proposed onshore substation. 


Physical application files are available for review at the Cape Cod Commission Office Monday-Friday from 8 a.m. to 4:30 p.m. Contact the Front Desk for more information, 508-362-3828.

Project Resources

View All Resources

127K pdf
Apr 05, 2019
2019-04-05-Application Suppllement-Email from Gerson
Prohibited Uses  Section 240-10.A  Use Variance Any use that is injurious, noxious or offensive by reason of odor, fumes, dust, smoke, vibration …
174K pdf
Feb 28, 2019
2018-03-19-Vineyard Wind-Hearing Notice, Procedural Opening of DRI
Caso estas informações sejam necessárias em outro idioma, por favor, contate o Coordenador de Título VI da MPO pelo telefone (508)362-3828 or …
8M pdf
Mar 20, 2019
2019-03-20-Vineyard Wind-Substation Plans Revised
DRAIN PIPE L=28' S=22\% PROPOSED 8" Ø SCH-40 PVC HEADER DRAIN PIPE L=426' S=22\% PROPOSED CAST-IN-PLACE RECTANGULAR OVERFLOW WEIR ELEV=64.50 PROPOSED 36" Ø …
Search Circle Icon Search Icon Document Icon Video Icon PDF Icon CSV/XLS Icon