Skip to Navigation Skip to Content
Start Date: 2019
Completion Date: 2019

Applicant: Clay Pond Acquisitions, LLC 
Project Site/Location: 170 Clay Pond Road, Bourne, MA (Map 31.4, Parcel 20)
Project Description: Proposed redevelopment of the Site for a self-storage facility, including: renovation of a portion of an existing commercial building, an addition to an existing commercial building, construction of new commercial structures for self-storage use, and associated Site improvements.

Physical project files are available for review at the Cape Cod Commission Office Monday-Friday from 8 a.m. to 4:30 p.m. Contact the Front Desk for more information, 508-362-3828.

Project Resources

View All Resources

45K pdf
May 17, 2019
2019-05-17 - 19014 - True Storage Redevelopment - Supplemental Materials
With respect to Energy Objective 3, as previously noted, energy consumption is minimized by proposing a use which has less demand/consumption than …
40M pdf
Jun 04, 2019
2019-04-11 - 19014 - True Storage Redevelopment - DRI Application Materials
April 11, 2019 0119577-00001 Eliza Cox Direct Line: (508) 790-5431 Fax: (508) 771-8079 E-mail: ecox@nutter.com By Hand Delivery \ Jon Idman, Esq
88K pdf
Jun 11, 2019
Revised Landscape and Stormwater Maintenance Guide-Page1
Enhanced Tree Trench o Runoff from the parking lot is collected in the existing catch basin and directed to a diversion manhole structure, which is …
Search Circle Icon Search Icon Document Icon Video Icon PDF Icon CSV/XLS Icon